FACTORY RELOCATION
A leading beverage and can manufacturer | Jeddah, Kingdom of Saudi Arabia
CASE STUDY
PROJECT OVERVIEW
Compass Logistics International managed the complete dismantling, packing, and international shipment of a large-scale beverage and can manufacturing facility, moving equipment from Jeddah to the United States and Malaysia within a four-month window.

THE CHALLENGE
Saudi export rules, U.S. customs, and Malaysian port protocols, all at once
The client ran three interdependent production systems: a Can Line, an End Line, and a Filling Line, producing aluminium cans for the regional market. When the company restructured and exited its Jeddah facility in 2022, the equipment was too valuable to scrap. The plan was to relocate the Can Line to a buyer in the United States, and the End and Filling Lines to Malaysia, simultaneously.
Production machinery isn’t ordinary freight. It’s bolted to foundations, plumbed into utility systems, and calibrated to precise tolerances. Disassemble it wrong, and it stops working. Pack it wrong, and it’s damaged before it reaches port. This project meant satisfying Saudi export rules, U.S. customs, and Malaysian port protocols, all at once, for two separate shipments, on one timeline.

THE SOLUTION
Each phase had to meet a defined standard before the next could begin. A mistake as small as leftover moisture before sealing a container can cause irreversible damage by the time a vessel arrives.

Every unit catalogued for dimensions, weight, and center of gravity before any work begins.

Food-safety protocol: debris removal, warm-water rinse under 120°F, full air drying.

Custom boxes, pallets, and skids, built on site to each unit's exact specifications.

Container inspection, heat-treatment stamping, lashing, silica gel, port dispatch.
Nothing was pre-made. Five to six dedicated carpenter teams, around 40 workers, built every box, pallet, and skid on site to match the exact dimensions and weight distribution of the unit it would carry. Out-of-gauge units traveled on custom skids; sensitive components were vacuum-wrapped in foil to block moisture.
ON THE GROUND
RESULTS

The Can Line, the larger shipment, accounted for 71% of total volume (5,190 CBM), bound for New York.

The End and Filling Lines made up the remaining 29% (2,100 CBM), bound for Port Klang.
Work ramped through June, hit peak intensity in July as Can Line packing ran full capacity, then tapered as final shipments departed for both destinations.
OUTCOMES
One team from site survey to final vessel dispatch, no third-party forwarder needed.
Every box, pallet, and skid custom-built to exact dimensions and center of gravity.
Separate documentation, port clearances, and vessel bookings managed in parallel across 53 booking references.
Dual-crane lifts, lowbed trailers, and specialist flat rack lashing for the heaviest machines.
Protecting both the machinery and the client's compliance at destination.